On-Time Delivery Up from 74%: Daily Board Meeting Instead of an Hour of Firefighting
Management · 3 min read · 18.11.2026

Client
The company is presented anonymously — this is a composite case study from multiple projects in the automotive supplier segment. Typical profile: an assembly plant with 260 employees operating three shifts, a single-purpose assembly line, and a wide portfolio of custom variants.
The project was initiated by the Operations Director. At the first meeting, his diagnosis was: "I can't say where production stood yesterday. And I don't want to explain it by email every day." The Production Manager and Quality Manager spent half the day answering questions that should have been answered on a single sheet of paper.

Challenge
On-time delivery was at 74%. Every morning started with an hour of firefighting — emails, phone calls, searching for material, arguing over priorities. No one had an up-to-date overview of the state of production or what was blocking the line that day.
Foremen spent an estimated half of their shift securing material that should have arrived through another channel. Overtime accounted for 9% of total working hours — management approved it because without it orders wouldn't get through, but a structural solution was never found. The result: expensive orders in logistics (external warehouses, express shipments) and burned-out foremen handling day-to-day firefighting instead of managing.
Approach
- Flow and measurement point diagnostics. For one week, we mapped where visibility was being lost — from material arrival to shipment. We identified 12 points where information about production status was generated, but no one consolidated it.
- Design of a daily management board. Together with the foremen, we designed a visual board by the line: plan vs. actual by shift, open issues with an owner and due date, status of critical material. The board was designed by people from the shop floor, not the office.
- Introduction of 15-minute meetings. A daily meeting at the board — same time, same agenda, same people, across all three shifts. Five minutes for KPIs, ten for problems and action items. No chairs, no projector.
- Redirecting foremen to management tasks. Kanban for critical materials and a regular cycle with logistics gave the foremen their time back. Their role at the meeting is to manage, not to chase material.
- Practice and sustainability. For three months, we coached the managers on running the meetings and solving problems. Then a monthly check — whether the standard was holding or the board had become decoration.
Results
The changes were gradual, but lasting. Results after six months:
- On-time delivery increased from 74% to 92%.
- Overtime reduced from 9% to 4.5% of total working hours — cut in half.
- 15-minute meetings with visual KPIs run every day across all three shifts.
What did not happen along the way: we didn't install a new information system or hire new people. What changed was the way daily management is carried out. The morning firefighting was replaced by a 15-minute routine that any manager can lead. A year after the project, the board functions as the place where decisions are made, and emails asking "where does it stand" have practically disappeared.
We use a similar approach in our cost work — see our services for an overview.