Take a walk through the workshop on Sunday evening. If the hall where nothing is being produced is lit up, the compressor is topping up a line that is quietly hissing somewhere, and the drying oven is holding temperature for material nobody will touch until Monday — you are watching money walk out the door even though nothing is being made. The energy bill stopped being an operational detail a long time ago. With orders stagnating, it is the second fastest way to defend your margin. Right after material costs.

Czech experts named expensive energy and labor shortages as the main threats to industry. Year-on-year production growth is slowing. The margin is being squeezed from both sides: orders are not coming in, but energy bills are. And energy is one of the few cost drivers you can reduce without investments and without layoffs — most losses are not in the technology, but in people's behavior and in standby modes. In the audits we run at Foreast, we keep finding the same five places. They are fixed with a brush, a wrench, and a standard. Not with an investment.

kWh per part, not the total bill: one number that will change your meeting

The total bill is a dead number. It grows with the energy price and nobody is accountable for it. kWh per part is alive: it tells you how much energy one part costs, and it can be brought down. You can calculate it on a single sheet of A4. Take the consumption from the main electricity meter reading on the bill, divide it by the number of parts produced in a month, and go back three months so you see a trend, not a fluke. Example: 24,000 kWh and 40,000 parts is 0.6 kWh per part. From then on, the question at the meeting sounds different. Not "how much did we pay," but "how much does a part cost us."

Alongside it comes a second number: the night and weekend baseline. On Friday, after the last shift leaves, read the main electricity meter. On Monday morning before startup, read it again. The difference is the plant's consumption at a time when it produces nothing. At the operations we have audited, it ranges between a tenth and a third of the monthly bill. If €4,000 of a monthly €24,000 falls on nights and weekends, you are looking at money that no part has paid for. Write the number down — in a month you will compare it.

A walk after shutdown: five places where energy escapes

You can get both numbers moving with a single walk through the plant, ideally Friday afternoon or Sunday evening. Take a notebook, a flashlight, and a bottle of soapy water. The bottle sounds like a joke. Around compressors, it is not.

  • Compressed air leaks. The most expensive noise in the workshop. A leak 3 mm across at 8 bar drains more than 3 kW of compressor output — continuously, through holidays and vacations. At most plants, leaks account for 20 to 30 percent of the air produced. You do not need an ultrasonic detector: soapy water and a brush will reveal leaking joints in one afternoon, and the bubbles show the exact spot.
  • Machine standby modes. A machine with a lit "ready" indicator is not waiting for free. Hydraulic units, control cabinets, tempering and drying equipment draw 1 to 4 kW per machine even when nothing is being produced. Walk through the hall and count the lit indicator lights.
  • A compressor running idle. With standard regulation, it keeps turning even at zero draw and eats a third to half of its rated power. One hissing leak in the line will feed it all weekend. After fixing the joints, shut it off completely for the weekend.
  • Lighting and extraction in empty halls. Divide lighting into zones by shift. Tie extraction to machine operation, not to the hall's master switch.
  • Cooling of aggregates. Chillers and the cooling circuit hold water temperature for machines that have been standing since Friday. Set a band, a timer, or a switch — with the name of the person responsible.
Standby mode is the most expensive way to not produce a single part over the weekend.

Next to each finding, note the draw in watts. The price calculates itself: one kilowatt running nonstop is more than 8,700 kWh per year. At €0.22/kWh, that comes to more than €1,900 per year for a piece of equipment you forgot to switch off.

Turn the list of findings into a system, not a one-off action

The walk finds the money. The system keeps it — without one, things return to their original state within a month. The foundation is an end-of-shift standard: a written list of the equipment that gets switched off, in what order, and what stays on, with justification. A tempered mold for a Monday start is a legitimate reason. A lit-up hall is not.

A foreman's name stands behind the standard. On Monday morning, they check the equipment on the shop floor, not a report in the office. And kWh per part becomes a standing item of the meeting: a weekly trend on the board next to OEE and the production plan. A number that changes gets addressed. A number that just hangs there gets ignored.

The order is what matters. First, quick wins without CAPEX — switch-offs, tightening joints, reprogramming standby modes, cooling setpoints. Frequency converters, a compressor station rebuild, or heat recovery come only after. Otherwise you are investing in optimizing losses you could have eliminated for free.

A machining company with 70 people cut its night and weekend baseline by 16 percent within three weeks of introducing a shutdown standard and fixing leaks. Without a single euro of investment. The money that used to escape through the air lines now stays in the margin every month.

Key takeaways

  • Read the main electricity meter on Friday after the shift and again on Monday morning. The difference shows how much you are paying for the time when nothing is being produced.
  • kWh per part: divide the monthly consumption from the bill by the number of parts produced and track the trend for at least three months.
  • Soapy water and a brush will find compressed air leaks in one afternoon — you do not need an ultrasonic detector.
  • A shutdown standard with a foreman's name and a Monday check on the shop floor will hold the savings longer than any CAPEX.

Orders are stagnating and the energy price is not. Whoever reduces kWh per part today gains a margin that competitors are chasing in product prices or in headcount. The first step for Monday: an afternoon walk through the closed plant and the kWh/part number at the next meeting. And energy is just one lever — we work with the full portfolio of cost drivers on our cost reduction page.



« Previous article  |  Next article »