Case Studies » Costs

Getting 18% of Offcuts Back into Production: How a Textile Manufacturer Coped with a 20% Rise in Fabric Prices

Costs · 3 min read · 04.11.2026

Client

A textile manufacturer with roughly 150 employees, production running in two shifts. The company sews garments in smaller batches — tens to hundreds of pieces per order, fabrics in several widths, often from end-of-collection lots. The case study is anonymized and composite: we assembled the events and numbers from several textile projects, not any single factory.

The project was kicked off by the operations director. Purchasing had just reported a year-on-year 20% increase in fabric prices, and cutting yield got onto the agenda of a management meeting for the first time. Until then, it had lived in monthly reports and one person's head.

Challenge

Cutting yield had held at 82% for years. The remaining 18% of fabric went into an intermediate warehouse for offcuts 'for someday', or straight into waste. Nobody could say how much offcut material was there, in what widths and quality. Rotation was almost zero and the space was filling up.

Cutting plans were drawn up manually by one experienced technician — in spreadsheets and by twenty years of intuition. When he was on vacation or off sick, cutting stood still, and the sewing halls with it. After the 20% price increase, every percentage point of cutting yield was worth tens of thousands of euros a year. Management wanted to know how much of the 18% could realistically return to production.

Approach

  1. Measurement instead of estimates. For four weeks we measured what remains after cutting: widths, lengths, why offcuts arise, and where they go. We set up a simple record organized by width and quality. The measurement alone showed that roughly a third of offcuts arise repeatedly from three types of components.
  2. Standardizing cutting preparation. We broke the technician's work into steps and documented them: fabric spreading rules, order priorities, and the calculation of the order mix. The result is a written procedure a stand-in can use for the preparation. We involved the technician from day one; the goal was to capture his experience, not question it.
  3. Optimizing cutting plans with software. We selected a marker-making tool suited to smaller batches. The technician mastered it within a few weeks. The software does not decide for him; it freed him from routine calculations, so he has time for the orders where the most can be saved.
  4. Rules for returning offcuts to production. We defined minimum offcut lengths and widths for individual components and assigned the foreman responsibility for using them. The intermediate warehouse got a limit and a rotation rule: whatever is not used within three months goes to a contracted buyer.
  5. Managing and sustaining the result. Cutting yield is written on a board in the hall every day, and once a week the foreman reviews it with the technician. For the first two months we were on the shop floor with them. Afterwards, operations took over.

Results

The first improvement came after six weeks; a stable state after roughly four months.

  • Cutting yield up from 82% to 91%, sustained even three months after our consultants left.
  • The offcut intermediate warehouse reduced by 30% thanks to limits and rotation rules.
  • Fabric consumption down 6–7% of the annual volume; some components now run on returned offcuts. At then-current prices, this amounted to hundreds of thousands of euros per year.

The key technician stayed. His twenty years of experience are now captured in a procedure he can hand over to younger colleagues. A vacation no longer stops cutting. Cutting yield remains a managed number at management meetings, not one person's private matter.

If meters of fabric at your company are also ending up in intermediate storage 'for someday', see how we handle this in our cost reduction service. We start with measurement on the shop floor, not a presentation in a meeting room.