Blog » Costs

How many units a month do you need to make a profit? You can calculate your break-even point on one side of A4

Costs · 6 min read · 21.09.2026

A new order lands on the Monday meeting. The managing director asks: "Can we handle it?" The controller opens the capacity sheet. The buyer works out the deadlines. The foreman looks at the pallets in front of the line. Ask at that moment from how many units a month your line earns money, and silence falls over the hall. At Foreast, we ask this question at the first meeting of every analysis. A specific number — not "it depends", not "roughly", but a unit count — is something one in ten managers can give. And even he often calculates with a price list and wages from three years ago, from the days before the jump in energy and wage costs.

Toyota does this math even though it sells millions of cars

Toyota chief Kenta Kon says publicly that he is lowering the breakeven volume — the production volume from which the company earns money. Toyota does not have a demand problem. Its problem is that volume has stopped being plannable. Carmaker orders hop between continents, more jobs are falling in the European automotive supply industry, and purchasing departments rewrite sourcing on the fly. A three-year volume guarantee? Nobody will sign one for you today.

With orders like these, what decides survival is cost structure, not volume. A company with a low break-even point survives even a year of decline. A company with a high break-even point slips into loss even at utilization that three years ago would have suited it fine. Mid-sized manufacturers in Slovakia and the Czech Republic mostly deal with this too late. They don't have the number — or they have an outdated one.

Profit is made by volume. Survival is made by cost structure.

We have a simple test for it. Can you say within 24 hours from how many units a month your operation earns money? If yes, you are in the minority. If not, read on. The calculation takes four numbers and one side of A4.

The break-even point lost in the close

The accounting close sorts costs by line item: wages, materials, energy, depreciation, services. Management needs a different sorting — by behavior. Which costs fall if you produce a thousand units less next month? The close doesn't know that question. That is why the company only feels the swings. An order drops, nothing happens for two months, then payments to suppliers suddenly get stuck. Nobody saw the threshold in time.

The culprit is not the accountant. Tax and reporting rules sort costs by purpose, not by behavior. But the decision on how much fixed cost the company can afford is a business one. And for that you need to see both groups separately.

The split itself is simpler than it seems. Wages with contributions, depreciation, hall rental, service contracts and overheads are fixed. Materials, packaging, transport and tooling are variable. Energy is usually half and half — split it by estimate. You can manage a first split with 80 percent accuracy in a day. Fine-tuning can wait until later.

Four numbers and one division

Pick one line. Write down four numbers:

  1. The line's monthly fixed costs. For example €195,000 — wages, depreciation, rent, service, a share of energy.
  2. Average price per unit. A weighted average of the actual mix, for example €58.
  3. Variable costs per unit. Material, packaging, transport, tooling — for example €45.
  4. Contribution margin. Price minus variable: 58 − 45 = €13 per unit.

The break-even point is one division. 195,000 ÷ 13 = 15,000 units a month. A line with a capacity of 18,000 units only earns money from unit 15,001. Buffer: 3,000 units, 17%. A 20% drop in orders doesn't take a little of the company's profit — it throws the company into loss, even though the shop floor looks decently loaded. "We are running at 80% and we are losing money" is today the most common sentence we hear on cost reduction projects.

Be careful with the average price. It works as long as the mix doesn't change significantly. Recalculate the number monthly after the close, not once a year — a ten percent change in mix shifts the break-even point by hundreds of units.

Three levers to lower the break-even point without layoffs

The first lever: fixed costs that do no work. Compressed air leaks commonly swallow 20 to 30% of compressor output; detection takes two days and returns thousands of euros a year. Add duplicate service contracts, oversized tariffs and heated space with unused equipment. Freeing up €4,200 of overhead a month at a contribution of €13 means a break-even point 323 units lower. And nobody touches a wage contract in the process.

The second lever moves costs from the fixed column to the variable one. A third shift is a fixed cost even in the months when you have nothing to produce; overtime on above-capacity orders rises and falls with volume. A machine rented and paid by the hour of operation instead of purchased. External transport charged per unit instead of your own fleet. Packaging and dispatch with a tariff per pallet.

The third lever is contribution per unit. A scrapped unit carries full material and takes the place of a unit sold. Scrap reduced from 3% to 1.5% saves 300 units a month at 20,000 units — at a contribution of €13 that is €3,900 and a break-even point lower by exactly those 300 units. The second direction is the mix. Rank your largest orders by contribution per unit, not by revenue; we almost always find two or three "volume" orders in there with a contribution below half the average, devouring capacity. And one boundary is hard: below variable costs, take nothing. Such an order will never cover the fixed costs — it widens the loss on every unit produced.

Key takeaways

  • The break-even point is one division: monthly fixed costs ÷ contribution margin from a single unit. You need nothing more on one side of A4.
  • You sort costs with a single question: "What in here falls if we produce 1,000 fewer units next month?" You can manage the first split in a day.
  • Recalculate the break-even point at every major change: a new machine, a lost order, a rise in material prices, an added shift, a change in mix.
  • Cutting scrap from 3% to 1.5% at 20,000 units a month means a break-even point 300 units lower. Quality is a cost lever, not just a report.

Kon is not lowering the breakeven volume because he has nothing to do. He is lowering it because volume is no longer a lever the company controls on its own. The same holds for a shop with 70 people near Žilina and for a plant near Brno. Until you have it written on one side of A4 — from how many units a month you earn money and with which three levers you are driving that number down — you are running the company on a gut feeling from the till. Open the latest close, divide four numbers and put the result on the board on the shop floor. A number the foreman sees every morning works better than a number in Excel.