Case Studies
Changeover from 45 to 12 Minutes: How an Engineering Company Cut Costs Without Layoffs
An engineering company with 240 employees was losing margin on small batches — long changeovers, overtime and a 4.2% scrap rate. The project paid for itself in five months: changeover time fell to 12 minutes and scrap dropped by 38%.
29.07.2026
News
Changeover from 45 to 12 Minutes: How an Engineering Company Cut Costs Without Layoffs
An engineering company with 240 employees was losing margin on small batches — long changeovers, overtime and…
29.07.2026